Skip to content
SerticSertic

Understand before you start.

Choose your situation. Find the steps and documents you need.

Describe my project

No obligation. Price confirmed before you agree.

Understand the process

Get an inventory

Understand what is in your building, with an inspection, analysis when needed and a report.

Explore this service

Prepare renovation work

Renovate a room, replace a boiler or open a ceiling. Check the materials that will be disturbed.

Explore this service

Remove asbestos

Roof, sheets, flooring, pipes or insulation. Define the right job with a professional.

Explore this service

All asbestos questions

Laboratory analysis

Sampling, analysis or air monitoring: understand the difference

Do I need to measure everything?

No. A rough size is enough to start. Choose ‘I don’t know’ if unsure. The professional checks relevant quantities before confirming the price.

I already have a report. Is it enough?

Its scope needs checking. A visual inventory or standard asbestattest may not cover hidden materials affected by your work. Give the report to the professional before work begins.

Who decides how many samples are needed?

The expert decides based on the materials and assignment. The indicative package includes one analysis. Additional samples and prices are agreed in advance. Don’t take samples yourself to fill in this form.

Why not a single price per square metre?

Access, material condition, removal method and waste matter as much as area. A small amount of damaged pipe insulation in a cellar may require more precautions than an intact, accessible roof.

When do I pay?

This request is free and does not place an order. The planned model is full payment after contract acceptance and before the intervention. The professional’s share is released after their completion notice and your confirmation, with no unresolved issue. Exact terms will be in the offer. This form collects no payment.

Is the inventory deducted from removal costs?

Not automatically. Inventory and removal are separate services. Any discount must appear in the offer. An ordered and completed inventory remains payable even if no removal is needed.

Is it compulsory everywhere in Belgium?

Requirements vary by region, building and planned work. Federal worker protection rules apply alongside regional rules. Town, construction year, existing report and planned works inform the specific assessment.

Describe my project

No obligation. Price confirmed before you agree.