Get an inventory
Understand what is in your building, with an inspection, analysis when needed and a report.
Explore this servicePrepare renovation work
Renovate a room, replace a boiler or open a ceiling. Check the materials that will be disturbed.
Explore this serviceRemove asbestos
Roof, sheets, flooring, pipes or insulation. Define the right job with a professional.
Explore this serviceAll asbestos questions
- Asbestos in Belgium: what rules apply by region?
Start with the building address, then the purpose: sale, renovation or removal. Federal worker protection rules apply alongside regional requirements. There is no single nationwide asbestos sale document.
- Flemish asbestattest: sale and co-ownership
An asbestattest describes identified asbestos materials and their management. It does not certify that a building is entirely asbestos-free and does not automatically replace pre-work investigation.
- Asbestos roofing: preparing removal and pricing
A photograph of corrugated sheets cannot confirm asbestos. Start with an existing report or analysis before removal. Roofing, access and waste destination then determine the project.
- Asbestos in cellars: pipes, insulation and boiler rooms
‘Removing asbestos from a cellar’ may involve a pipe, insulation, panels or several materials. First identify what needs treatment. Floor area alone cannot price the project.
- Asbestos waste: collection, transport and records
Removal and disposal are two steps to plan together. Home collection or recycling-centre access does not automatically include dismantling. Not every route accepts every asbestos type.
- Inspector, laboratory, contractor: who does what?
The right document does not replace the right professional. Sertic prepares introductions and checks that professional credentials match the assignment. A directory listing alone does not prove a partnership or approval for every activity.
- Asbestos: renovating a kitchen or bathroom
Before removing tiles, flooring or a suspended ceiling, describe the layers and components affected by the work. That scope determines preparation, even if you already have an asbestos report.
- Solar panels and asbestos roofing
Before booking solar installation, clarify the materials in the roof and under-roof layer. The project may need a different sequence: investigation, any necessary removal, replacement roofing and then installation.
- Positive asbestos report: what next?
A positive result starts a decision; it is not a project price. Identify the material, location and recommendations before requesting the next step.
- Asbestos before demolition: which inventory?
Price and investigation depend on what will be demolished. Prepare the scope, existing reports and access before requesting an offer.
- Selling a property with asbestos in Brussels or Wallonia
Do you need a certificate before selling? What should the buyer receive? Prepare the property file and distinguish sale requirements from work permits.
- Selling without an asbestattest in Flanders: what happens?
A missing, expired or late certificate needs attention before signing. A sale is not automatically cancelled.
- Asbestos discovered after purchase: what can you do?
Before alleging a hidden defect, document the material, the report received and the information exchanged during the sale.
- Asbestos in a rented home: tenants and landlords
Damaged material, planned work or an existing certificate: make a clear report and identify the right contact.
- Asbestos in co-ownership: common parts, managers and sales
An apartment and its common parts may need different documentation. Prepare for sales and the Flemish 2027 deadline.
- Work without asbestos checks: duties and risks
Drilling a roof, replacing a pipe or demolition: check investigation, contractors and permissions before starting.
- I may have inhaled asbestos: what should I do?
Concerned about broken or drilled material? Stop the operation first, then distinguish assessment of the site from medical advice.
- Asbestos: symptoms, diseases and latency
A cough does not prove an asbestos-related disease. Understand the limits of online information and prepare a useful conversation with your doctor.
- Asbestos at home: intact, damaged or needing removal?
An Eternit roof, pipe or panel cannot be assessed by appearance alone. Its condition and planned work also matter.
- Asbestos-related disease: compensation in Belgium
The Asbestos Fund assesses applications. Asbestos in a home alone does not establish entitlement to compensation.
- Asbestos regulations in 2026: what changes for your project?
Federal and regional changes do not all require the same document. Here are the recent points to check when preparing your assignment.
- Destructive or non-destructive asbestos inventory: which do you need?
Selling, managing a building and opening a wall require different investigation scopes. The right inventory starts with what you actually plan to do.
- Asbestos removal or encapsulation: understanding the methods
Roofing, pipe insulation or floor adhesive: material and condition guide the method. Understand the quote without having to choose a site technique yourself.
- After asbestos removal: checks, air measurements and records
Completion of removal and release of the site should be planned in the quote. Clarify these points to bring the assignment to an orderly close.
- Asbestos removal in an occupied home: how should you prepare?
Staying at home, accessing the cellar and keeping the heating on should be discussed before work starts. Agree a clear plan with the contractor and, in shared buildings, the manager.
- Asbestos sampling and analysis: understand your assignment
How many samples, what result and what price? Clarify these points for an appropriate investigation, without taking samples yourself.
- Asbestos inventory: how long is it valid and when must it be renewed?
A sale certificate, workplace record or renovation survey: first identify your document. Its date alone does not tell you whether it still fits your project.
- Asbestos left in place: organising building management
After an inventory or partial removal, the records should remain useful for the next intervention. Prepare follow-up with the owner, building manager or employer.
Laboratory analysis
Sampling, analysis or air monitoring: understand the difference
Do I need to measure everything?
No. A rough size is enough to start. Choose ‘I don’t know’ if unsure. The professional checks relevant quantities before confirming the price.
I already have a report. Is it enough?
Its scope needs checking. A visual inventory or standard asbestattest may not cover hidden materials affected by your work. Give the report to the professional before work begins.
Who decides how many samples are needed?
The expert decides based on the materials and assignment. The indicative package includes one analysis. Additional samples and prices are agreed in advance. Don’t take samples yourself to fill in this form.
Why not a single price per square metre?
Access, material condition, removal method and waste matter as much as area. A small amount of damaged pipe insulation in a cellar may require more precautions than an intact, accessible roof.
When do I pay?
This request is free and does not place an order. The planned model is full payment after contract acceptance and before the intervention. The professional’s share is released after their completion notice and your confirmation, with no unresolved issue. Exact terms will be in the offer. This form collects no payment.
Is the inventory deducted from removal costs?
Not automatically. Inventory and removal are separate services. Any discount must appear in the offer. An ordered and completed inventory remains payable even if no removal is needed.
Is it compulsory everywhere in Belgium?
Requirements vary by region, building and planned work. Federal worker protection rules apply alongside regional rules. Town, construction year, existing report and planned works inform the specific assessment.
No obligation. Price confirmed before you agree.