Skip to content
SerticSertic

Renovating with suspected asbestos

One room, a cellar or the whole house: start with the work you are planning.

Describe my project

No obligation. Price confirmed before you agree.

Understand the process
Preparing an inventory in a house awaiting renovationSertic
The rooms and planned work help define which areas need investigation.

Is an existing report enough?

Not automatically. The expert checks affected materials and concealed areas. Federal protection also covers employees working in a private home.

SPF Emploi, inventaire et travaux

How do you describe the work simply?

State the room and what will change: removing tiles, opening a ceiling, replacing a pipe or demolishing an outbuilding. Add available plans and photos taken without touching materials. ‘I don’t know’ is fine for an unknown material or measurement. Renovating one room is a different assignment from demolishing a whole building.

Pre-work inventory price: is sampling included?

The quote should specify this. Compare the visit, included samples and analyses, openings, repairs and report. Record the price and required approval for any extra analysis. Any removal is a separate item. Sertic confirms price and scope before you commit.

For this step: Asbestos sampling and analysis: understand your assignment · Prices and services

Renovating one bathroom: must the whole house be surveyed?

For a contractor’s employees in a private home, FPS Employment focuses on materials that could expose them. Defined work does not automatically require surveying the entire building. Have affected areas, concealed layers and access routes agreed before booking.

SPF Emploi, inventaire et travaux

For this step: Asbestos: renovating a kitchen or bathroom · Destructive or non-destructive asbestos inventory: which do you need?

Black adhesive under flooring: can you start removing it?

Colour alone cannot identify asbestos. Have the flooring and adhesive assessed separately before disturbing them. A result for one layer does not necessarily cover the other; identifying both may change the proposed removal method.

SPF Emploi, inventaire et travaux

For this step: Asbestos sampling and analysis: understand your assignment · Asbestos removal or encapsulation: understanding the methods

Asbestos found during work: must the report be updated?

Report the discovery before work continues in the affected area. In Flanders, asbestos missing from the certificate is a changed situation: OVAM requires renewal within a year. A sale still requires a valid certificate; this deadline does not make an invalid document usable.

OVAM, renouvellement et changement de situation

For this step: Asbestos inventory: how long is it valid and when must it be renewed? · Destructive or non-destructive asbestos inventory: which do you need?

Requirements at the building’s address

The same project may involve different requirements in Brussels, Flanders or Wallonia. Choose the building’s region, then your town to prepare access and useful documents.

All asbestos guides and projects

Describe my project

No obligation. Price confirmed before you agree.